Aquafine Aqua 2 User Manual
After this time, the lamp glass will photochemically change and no longer allow sufficient 254-nm shortwave UV, the germicidal ray of the lamp, through the glass to effectively kill bacteria. Failure to replace the ultraviolet lamps on a timely basis of at least once every 8,000 hours may cause the equipment to fail. With intermittent use, in no case should the ultraviolet lamp be used for more than 24 months of operation without replacement, regardless of the number of hours of operation, due to normal operational degradation of the UV lamp. Cleaning the quartz sleeves Visually inspect a quartz sleeve thirty days after use to see if any debris or film has settled on the outside. If dirty, use the cleaning procedures that follow. Prior to removing the cover to access the lamps and quartz sleeves, you must release all pressure to the UV treatment chamber. Drain the chamber if required.
Aqua II Softener Manual – Aquacliniq A water softener contains resin beads which hold electrically charged ions. When hard water passes through the softener, calcium and magnesium ions are attracted to the charged manual regeneration and advance the valve to the Backwash position. Aquafine Aqua 2 Water Softener Manual Mavis Bacon provides not only lessons and. Manual For Aquafine Water Softener. Nothing about it and there is user manual.
If the inlet water temperature exceeds 100°F (38°C), contact the factory for assistance. Do not allow the water temperature to drop below 35°F (2°C). Do not allow the flow rate to exceed the maximum rated capacity. DO NOT ELECTRICALLY CYCLE THE UV UNIT MORE THAN THREE (3) ON/OFF CYCLES IN A 24-HOUR PERIOD. Before start up, flush the UV unit and discharge piping to rinse out any debris left from installation. DO NOT LOOK AT UV LIGHT 4 SL series The SL Series is the appropriate choice for many low volume indoor applications because it offers a compact footprint and easy installation.
All supply connections are to be made in a UL-listed junction box suitable for the number and size of conductors. The instructions shall also specify that the junction box is to be directly attached to the unit. 8 plumbing schematic for all SL series ultraviolet treatment units Service clearance required on this end. RUNNING TIME METER LED UV LAMP OPERATIONAL DISPLAY PANEL Model SL-10A MOUNTING BRACKET - 2 PLACES 9 quartz sleeve installation The quartz sleeves designed for this unit are open on both ends. For first time unit installations, follow these quartz sleeve installation procedures: 1.
Also check the power to the softener. Check to make sure the bypass is not open.
Aqua Fine Aqua 2 Water Softener Manual
Verify the quartz sleeves are clean. If quartz sleeve fouling has caused the optical sensor alarm to activate, the quartz sleeves must be cleaned. At the same time, you must clean the sensor probe quartz window.
On the side of the unit is a knockout for electrical input power. To maintain your UV units warranty, please fill out and mail the Warranty Registration Card in the back pocket of this manual to Aquafine Customer Service. The following installation and operating conditions are considered hazardous or damaging to the equipment and can compromise the ability of the Aquafine unit to perform as intended. ANY OF THE FOLLOWING CONDITIONS WILL VOID THE EQUIPMENT WARRANTY. Failure to connect proper electrical service to unit. Failure to properly ground the unit.
(This option is for RA finish cylinders). Each treatment chamber is fitted with two raised-face stainless steel flanges (in the case of the MP-2-SL, each chamber has one flange each). The bottom flange is always designated as the inlet, while the top flange is the outlet. Inside the inlet flange is a helical baffle that prevents laminar flow and maximizes the unit's performance. The quartz sleeves fit inside the UV treatment chamber through the threaded nipples.
STANDARD UNITS The device automatically turns the UV lamps off when the water temperature reaches 120ºF (49ºC) and automatically turns the UV lamps back on when the temperature falls to 100º F (38ºC). HIGH TEMPERATURE (HT) UNITS The device automatically turns the UV lamps 'off' when the water temperature reaches 170ºF (77ºC) and automatically turns the UV lamps back 'on' when the temperature falls to 150ºF (66ºC). This temperature spread prevents excessive stop/starts during no flow conditions, and it protects the UV lamps and the electrical components from overheating damage. The temperature probe is located in the inlet riser. No operator intervention is required other than periodic visual verification that the UV lamp(s) are properly operating during normal water flow conditions. It is essential that all non-operational lamps be changed immediately to maintain system efficiency.
Step 5: Insert lamp into quartz sleeve. Step 8: Slide boot onto lamp socket assembly.
Additional service logs are available from Aquafine, and are intended to be placed on top of the existing service logs. Running time meter with lamp LED indicator. 12 more model S-254 UV optical sensor The optional S-254 UV optical sensor measures the relative output of ultraviolet light within the UV treatment chamber. Degradation of the UV lamps, fouling of the quartz sleeves, and increased turbidity of the water will affect the sensor reading. The UV meter assembly and instrumentation setpoint potentiometers are located on the electrical enclosure. The peripheral alarm contacts are accessible S-254 optical sensor meter from the back side of the meter.
• Click 'Start' • Click on 'Control Panel' • Under Programs click the Uninstall a Program link. How to uninstall Asoftech Data Recovery? How do I uninstall Asoftech Data Recovery in Windows Vista / Windows 7 / Windows 8? • Select 'Asoftech Data Recovery' and right click, then select Uninstall/Change.
Gradually start the normal flow rate. Bring the unit up to normal operating pressure. Turn the UV lamps on for a minimum of 15 minutes. Open the S-254 meter door. R3L R8L The S-254 UV optical sensor provides information about the relative amount of UV passing through the water. The reading is affected by quartz sleeve fouling and/or the germicidal lamp efficiency. The UV sensor is sensitive to, and reflects changes in, UV transmission when a substantial change occurs in the normal operating flow rate, temperature, operating pressure, or quality of the fluid flowing in the system.
Normal operating temperature for standard UV units is 35° to 100°F (2°- 38°C). For high temperature units, normal operating temperature is 35° to 150°F (2°- 66°C).
Holding the cap in a down position, the operator should then hold his breath while taking the sample so as to avoid atmospheric contamination of the sample. The operator must also not allow his finger to touch the inside of the cap or the neck of the bottle. After the water sample has been taken, the cap should be immediately secured on the sample container. The sample container should be labeled and placed in a plastic wrapping and must be taken to the laboratory for plating as soon as possible. Processing should begin within three hours of sample collection and should comply with accepted standard methods. The above procedure was developed by a leading national pharmaceutical firm after an 18-month study.
Aqua 2 Water Stove
Failure to avoid undue overhead piping stress which can result in structural damage to the UV unit. Limit the load to 10 lbs (4.54kg) per flange. Use of components other than those provided or authorized by Aquafine. Failure to correct overhead piping connection leaks or compression nut seal leaks which result in damage to the electrical components.
If clear, fresh water is used, the probable cleaning frequency will be anywhere from once every thirty days to once every six months. You can determine this cleaning frequency. This is done by visually inspecting any one quartz sleeve to see if any debris or film has settle on the outside of the quartz sleeve.
Remove unit cover. Insert quartz sleeve into threaded nipple. Socket retainer cap on comp nut Rotate compression nut clockwise 10 installing the UV lamps Once is has been verified that there are no leaks in the system, the UV lamps are ready for installation. Remove all power to the UV unit. Depressurize the system.
Some pushing and twisting may be required. Deionized water may be used as a lubricant. Tighten the compression nut approximately 1/2 turn after the threaded nipple and o-ring make contact. Repeat this procedure for the second endplate. Slowly pressurize the system and fill the chamber with water to check for leaks. If the compression nut leaks, use the special tool to screw the compression nut assembly onto the threaded nipple.
RJ Aug 14, 2011 . A water softener ether softens or it doesn't. If you are getting hardness leak through continually check to make sure that the bypass valve is closed completely. ( the handle where the pipes go into and out of the softener, make sure the pointer is pointing to service). If you are getting soft water most of the time and it goes hard just before regeneration check the incoming water hardness, if it has gone up you will need to adjust the hardness setting on the unit or if it operates on time, set it to regenerate more often. Mar 20, 2010 . Film on the glasses may be a sign that the softener is not working correctly.
OH, I looked all over the net for anything on Aquafine.all I get is something about lightbulbs?then I read here that they seem to be defunked.yippee. Any help would be greatly appreciated.our water tastes like crap and is hard enough to cut with a chainsaw. Thanks folks. The thing with the dials, the power cord, the brine line, the drain line and the inlet/outlet water lines attached to it, that's the control valve and its by pass valve. The control valve is attached to the resin tank. The smaller tank with the lid, that's the salt/brine tank.